A global leader in the design and manufacture of custom MissionBuilt™ engineered solutions and high-performance Purpose Built precision machine tools for the power generation sector, Tri Tool is a preferred and trusted partner for nuclear power plant decommissioning and dismantling equipment services around the world.
Our Field Services team and machining solutions have been used to dramatically improve decommissioning timelines, lower costs, and minimize worker exposure in high radiation settings. Our automated and remote tooling expertise enables us to deliver equipment that reduces personnel contact with irradiated components and grants access to tighter tolerances and underwater environments. With ready-access to a wide-range of tools and a global network of highly skilled technicians, Tri Tool helps you "cut the untouchable" faster, safer, and on-budget.
With decades of experience manufacturing and operating pipe bevelers, pipe and tube cutting machines, Tri Tool offers a range of on- and off-site field machining services to facilitate a safer, faster, more economical decommissioning.
At Tri Tool, safety is our number one priority. Our Field Services team undergoes comprehensive equipment and safety training in compliance with OSHA regulations and completes detailed pre-job planning to ensure equipment is properly maintained, risks are minimized, and personnel remain healthy and safe.
Orano USA partners with Tri Tool to develop a custom engineered solution to remotely sever underwater jet pumpdiffusers in Vermont Yankee nuclear reactor vessel Tri Tool was tasked with assisting with the removal of 20 underwater jet pump diffusers contained in a highly contaminated environment. To safely sever the jet pump diffusers, Tri Tool had to develop a specialty tool that could be lowered down 70 feet underwater and remotely cut each diffuser in half mounted on the OD. Then, Tri Tool had to develop an additional ID mounted machine that could sever the other half of the pump.
German Machinery Trading (GMT) Co., Ltd. uses multiple split-frame clamshells from Tri Tool to accelerate the decommissioning of the Hamaoka Nuclear Power Plant in Japan During the second stage of the decommissioning project, Units 1 and 2 of the Hamaoka Nuclear Power Plant require the dismantling of surrounding equipment and of equipment in the turbine building. Therefore, personnel need machining solutions that can quickly and effectively dismantle equipment to minimize high-radiation exposure.
In 2014, the Vermont Yankee Nuclear Power Station permanently shut down. Orano USA, a leading technology and services provider for decommissioning nuclear energy facilities, was tasked in Phase 1 of the decommissioning project to depose a portion of the nuclear reactor pressure vessel and remove...
Already a rapidly developing sector, hydrogen storage and transport can benefit from Tri Tool's expertise in power generation machining and pipeline construction.
Tri Tool has announced today the development and launch of the new 300STS Series the world's most compact, rugged, and agile tube squaring tool. Designed to provide the optimal combination of precision, power and portability, the new 300STS Series helps machinists do more with less.
Tri Tool has announced Alex Muhs as a member of Tri Tool's Strategic Leadership Team, where he will serve as Head of Operations, leading the Manufacturing Operations group consisting of machining, assembly, quality assurance, production planning, maintenance, and environment safety and health.
Tri Tool has announced today the selection of Sara Henson as the new Vice President of Field Services in industrial and power generation markets...